Comparison of resource distribution metrics on multi-resource projects

Öz:
Resource leveling is implemented to reduce the fluctuations of the daily resource usage and the peak resourceusage throughout the construction period. Measurement of peak resource demand is straightforward, whilefluctuations of resource distribution are difficult to evaluate. Therefore, many resource distribution metricsare proposed in order to measure the fluctuations of the resource distribution. In this study, minimummoment, absolute difference, sum of the squares, and minimum deviation resource distribution metrics arecompared by implementing resource distribution on four case study problems obtained from the previousstudies. The case study problems are optimized by exhaustive enumeration in order to ensure that the globaloptimum is obtained for each resource distribution metric. Recently the comparison was conducted for smallprojects. In this study, larger projects are evaluated to examine the effects of the project size and the searchdomain. Optimized resource distribution metrics are compared in terms of peak resource demand and theoverall resource distribution histogram. Similarity to the standard 'S' curve is expected for good fit resourcedistribution. The metrics are also compared in terms of easiness of implementation and computationaldemand. Results of the analyses revealed that minimum moment metric provided lower peak resourcedemand among the other resource distribution metrics. In addition to this, computational demand andeasiness of implementation of the minimum moment metric is the most suitable. The results of this researchcan be beneficial for the project managers through the selection of appropriate resource distribution metric.
Anahtar Kelime:

Konular: Yeşil, Sürdürülebilir Bilim ve Teknoloji İnşaat Mühendisliği İnşaat ve Yapı Teknolojisi
Belge Türü: Makale Makale Türü: Araştırma Makalesi Erişim Türü: Erişime Açık
  • [1] Rieck J, Zimmermann J, Gather T (2012). Mixedinteger linear programming for resource leveling problems. European Journal of Operational Research, 221(1), 27-37.
  • [2] Neumann K, Schwindt C, Zimmermann J (2012). Project scheduling with time windows and scarce resources: temporal and resource-constrained project scheduling with regular and nonregular objective functions. Springer Science & Business Media.
  • [3] Karaa FA, Nasr AY (1986). Resource management in construction. J. Constr. Eng. Manage., 112(3), 346-357.
  • [4] Easa SM (1989). Resource leveling in construction by optimization. J. Constr. Eng. Manage., 115(2), 302-316.
  • [5] Demeulemeester E, Herroelen W (1992). A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem. Manage. Sci., 38(12), 1803-1818.
  • [6] Bandelloni M, Tucci M, Rinaldi R (1994). Optimal resource leveling using non-serial dynamic programming. Eur. J. Oper. Res., 78(2), 162-177.
  • [7] Neumann K, Zimmermann J (1999). Resource Levelling for Projects with Schedule-Dependent Time Windows. Eur. J. Oper. Res., 117(3), 591- 605.
  • [8] Mutlu MÇ (2010). A branch and bound algorithm for resource leveling problem, MSc Thesis, METU.
  • [9] Erzurum T. Optimum Or Near-Optimum Solution Of Resource Leveling Problems With Spreadsheet Application, Master of Science Thesis, İnönü University, Malatya, Turkey, 2019.
  • [10] Burgess AR, Killebrew JB (1962). Variation in activity level on a cyclical arrow diagram. J. Indust. Eng., 13(2), 76-83.
  • [11] Ahuja HN. Construction performance control by networks, Wiley, NY, 1976.
  • [12] El-Rayes K, Jun DH (2009). Optimizing resource leveling in construction projects. J. Constr. Eng. Manage., 135(11), 1172-1180.
  • [13] Erzurum T, Bettemir ÖH. Determination of Search Domain Of Resource Leveling Problem, International 7th Construction Management Congress, Samsun, 2017.
  • [14] Erzurum T, Bettemir ÖH. Optimum or NearOptimum Resolution of Resource Leveling Problems with Spreadsheet Application, 5th International Project and Construction Management Conference - IPCMC2018, Cyprus International University, Faculty of Engineering, Civil Engineering Department, North Cyprus, 2018.
  • [15] Bettemir ÖH, Erzurum T. Comparison of Resource Distribution Metrics On Small Projects. International Civil Engineering and Architecture Conference (ICEARC'19), 17-20 April (2019), Trabzon, Türkiye.
  • [16] Geng JQ, Weng LP, Liu SH (2011). An improved ant colony optimization algorithm for nonlinear resource-leveling problems. Computers & Mathematics with Applications, 61(8), 2300-2305.
  • [17] Hinze JW. Construction Planning and Scheduling, 3rd Edition, Pearson Prentice Hall, Upper Saddle River, NJ, 2006.
  • [18] Akpan EOP (2000). Resource smoothing: a cost minimization approach. Production Planning & Control, 11(8), 775 - 780.
  • [19] Son J, Skibniewski MJ (1999). Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), 23-31.
APA BETTEMİR Ö, ERZURUM T (2019). Comparison of resource distribution metrics on multi-resource projects. , 93 - 102. 10.31462/jcemi.2019.02093102
Chicago BETTEMİR Ö. H.,ERZURUM T. Comparison of resource distribution metrics on multi-resource projects. (2019): 93 - 102. 10.31462/jcemi.2019.02093102
MLA BETTEMİR Ö. H.,ERZURUM T. Comparison of resource distribution metrics on multi-resource projects. , 2019, ss.93 - 102. 10.31462/jcemi.2019.02093102
AMA BETTEMİR Ö,ERZURUM T Comparison of resource distribution metrics on multi-resource projects. . 2019; 93 - 102. 10.31462/jcemi.2019.02093102
Vancouver BETTEMİR Ö,ERZURUM T Comparison of resource distribution metrics on multi-resource projects. . 2019; 93 - 102. 10.31462/jcemi.2019.02093102
IEEE BETTEMİR Ö,ERZURUM T "Comparison of resource distribution metrics on multi-resource projects." , ss.93 - 102, 2019. 10.31462/jcemi.2019.02093102
ISNAD BETTEMİR, Ö. H. - ERZURUM, T.. "Comparison of resource distribution metrics on multi-resource projects". (2019), 93-102. https://doi.org/10.31462/jcemi.2019.02093102
APA BETTEMİR Ö, ERZURUM T (2019). Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online), 2(2), 93 - 102. 10.31462/jcemi.2019.02093102
Chicago BETTEMİR Ö. H.,ERZURUM T. Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online) 2, no.2 (2019): 93 - 102. 10.31462/jcemi.2019.02093102
MLA BETTEMİR Ö. H.,ERZURUM T. Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online), vol.2, no.2, 2019, ss.93 - 102. 10.31462/jcemi.2019.02093102
AMA BETTEMİR Ö,ERZURUM T Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online). 2019; 2(2): 93 - 102. 10.31462/jcemi.2019.02093102
Vancouver BETTEMİR Ö,ERZURUM T Comparison of resource distribution metrics on multi-resource projects. Journal of Construction Engineering, Management & Innovation (Online). 2019; 2(2): 93 - 102. 10.31462/jcemi.2019.02093102
IEEE BETTEMİR Ö,ERZURUM T "Comparison of resource distribution metrics on multi-resource projects." Journal of Construction Engineering, Management & Innovation (Online), 2, ss.93 - 102, 2019. 10.31462/jcemi.2019.02093102
ISNAD BETTEMİR, Ö. H. - ERZURUM, T.. "Comparison of resource distribution metrics on multi-resource projects". Journal of Construction Engineering, Management & Innovation (Online) 2/2 (2019), 93-102. https://doi.org/10.31462/jcemi.2019.02093102